Skip to content

CEF References Road

ASFINAG

Vienna / Austria

ASFiNAG Logo

24-AT-TG-TPAD

The project concerns the development of 144 safe and secure parking spaces for trucks in Austria across four rest areas (i.e. Walgau South, Haiming South and Telfs North) that will reach the bronze level standard. The main benefit of the project will be improved road safety and better conditions for professional drivers.


CEF grant: 6.00 mio. Euros

Total costs of the project: 12.00 mio. Euros


ASFINAG

Slovenia / Austria

ASFiNAG Logo

2016-EU-TA-0046-W

EU funding application for the design for a second tube for the Karawanken-tunnel on the cross-border section Austria-Slovenia in 2014.


CEF grant: 17.71 mio. Euros

Total costs of the project: 177.14 mio. Euros


ASFINAG

Germany / Austria

ASFiNAG Logo

2015-EU-TM-0261-M

Expansion of safe & secure truck parking spaces and truck parking information systems on the TEN-T core network in Austria and Germany (Bavaria) in 2015.

CEF grant: 4.05 mio. Euros

Total costs of the project: 17.15 mio. Euros


ASFINAG

Slovenia / Austria

ASFiNAG Logo

2014-AT-TA-0156-S

Construction of the second tunnel tube for the Karawanks road tunnel on the cross-border section Austria-Slovenia.

CEF grant: 3.52 mio. Euros

Total costs of the project: 7.05 mio. Euros


ASFINAG

Vienna / Austria

ASFiNAG Logo

2014-AT-TA-0064-M

Reinforcing the Baltic-Adriatic Corridor between Vienna and Brno by extending the Austrian A5 North mo-torway as a cross-border project with the Czech R52 (here: Planning and construction of the A5 North motorway, Schrick – Poysbrunn section) in 2014.

CEF grant: 21.07 mio. Euros

Total costs of the project: 200 mio. Euros


ASFINAG

Vienna / Austria

ASFiNAG Logo

2014-AT-TA-0063-S

Reinforcing the Baltic-Adriatic Corridor between Vienna and Brno by extending the Austrian A5 North motorway as a cross-border project with the Czech R52 (here: Planning of the A5 North motorway, section between Poysbrunn and the national border) in 2014.

CEF grant: 1.32 mio. Euros

Total costs of the project: 2.64 mio. Euros