CEF References Energy
INELFE (REE & RTE)
Gulf of Biscay

2017-EU-0012-W
PCI 2.7 Spain-France interconnection
Works for Biscay Gulf electricity France-Spain interconnector.
CEF grant: 578.487 mio. Euros
Total costs of the project: 1,630 mio. Euros
GAZ-SYSTEM S.A.
Poland / Denmark

8.3.1-0009-PLDK-S-M-18
Reinforcement of Nybro-Poland/Denmark Interconnection
Construction works for the infrastructure elements of Interconnection.
CEF grant: 214.92 mio. Euros
Total costs of the project: 716.40 mio. Euros
Elering AS
Estonia / Finland

8.1.1-0040-FIEE-S-M-14
Interconnector between Estonia and Finland
The scope of the Action is to interconnect the natural gas transmission networks of both countries.
CEF grant: 206 mio. Euros
Total costs of the project: 300 mio. Euros
AB „Amber Grid“
Poland / Lithuania

8.5-0045-LTPL-S-M-14
Construction of the Gas Interconnection Poland-Lithuania
The Action will establish high transmission capacities between both countries.
CEF grant: 266 mio. Euros
Total costs of the project: 558 mio. Euros