CEF References Energy

INELFE (REE & RTE)

Gulf of Biscay

INELFE Logo

2017-EU-0012-W

PCI 2.7 Spain-France interconnection

Works for Biscay Gulf electricity France-Spain interconnector.

CEF grant: 578.487 mio. Euros

Total costs of the project: 1,630 mio. Euros


GAZ-SYSTEM S.A. 

Poland / Denmark

8.3.1-0009-PLDK-S-M-18

Reinforcement of Nybro-Poland/Denmark Interconnection
Construction works for the infrastructure elements of Interconnection.

CEF grant: 214.92 mio. Euros

Total costs of the project: 716.40 mio. Euros


Elering AS 

Estonia / Finland

8.1.1-0040-FIEE-S-M-14

Interconnector between Estonia and Finland
The scope of the Action is to interconnect the natural gas transmission networks of both countries.

CEF grant: 206 mio. Euros

Total costs of the project: 300 mio. Euros


AB „Amber Grid“ 

Poland / Lithuania

8.5-0045-LTPL-S-M-14

Construction of the Gas Interconnection Poland-Lithuania

The Action will establish high transmission capacities between both countries.

CEF grant: 266 mio. Euros

Total costs of the project: 558 mio. Euros